Newcastle upon Tyne Magistrates’ Court heard how Meldrum Õ¥Ö¼§ Services Ltd (MCS) was the principal contractor for refurbishment work at premises in Percy Street, Newcastle-upon-Tyne.
MCS failed to plan for the requirement for temporary platforms to be installed in the service riser to provide a safe work area. Subsequently, temporary floors were installed to specifications for which they had not been designed. A worker stepped onto the temporary wooden floor on the first floor riser. It collapsed and he fell 4.5 metres to the floor below, spraining both ankles.
An investigation by the Health & Safety Executive (HSE) into the incident, which occurred on 6th July 2015, found that MCS failed to plan and manage the temporary works within the service riser.
Meldrum Õ¥Ö¼§ Services Ltd of Panteon Building, Lancaster Road, Dunston, Gateshead, pleaded guilty to breaching Regulations 13(1) of the Õ¥Ö¼§ (Design and Management) Regulations 2015, and was fined £120,000 and ordered to pay costs of £1,969.