The work involves the construction of a 600m quay structure on the tidal reaches of the River Humber together with the reclamation of 8 hectares of foreshore.Â
Approximately 6.5 hectares of the existing Alexandra Dock will need infilling to allow construction of a reinforced concrete ro-ro ramp and associated berthing dolphins for the mooring and loading or unloading of vessels.
The site will be focused on Siemens’ production and export of wind turbines.
Details can be found in Õ¥Ö¼§ section
Got a story? Email news@theconstructionindex.co.uk