The contract covers the detailed civils design work for dam, powerhouse, spillways and switch yard.
The scheme is located in Mus province of Eastern Anatolia in Turkey. The dam body is a clay-cored rockfill dam and the installed capacity will be 280MW with an annual generation of about 860GWh.
Got a story? Email news@theconstructionindex.co.uk