Work involves replacing an existing hydrant main serving the Air Mobility Command (AMC) Ramp, which is past its usable life.
Spiecapag UK will remove the existing aluminium main and replace it with a stainless steel main along with new hydrants, and associate leak detection and cathodic protection.
The pump house will be upgraded and all pumps and filters replaced. A new product recovery tank and truck loading area will also be constructed.
Got a story? Email news@theconstructionindex.co.uk